Table of Contents
Make the switch#
Whether you’re moving workloads from AWS, Azure, GCP, on-premises infrastructure, or legacy hosting models, we get you to EU-sovereign cloud with minimal disruption.
Assessment#
Before committing resources, you need a clear picture of what you’re working with and where you’re heading.
- Workload inventory — Existing workloads, dependencies, and data classification across AWS, Azure, GCP, or on-premises environments
- Application mapping — Dependency mapping and stateful vs stateless workload identification
- Network analysis — Topology analysis and traffic flow documentation
- Compliance gap analysis — GDPR, NIS2, and industry-specific requirements relating to infrastructure and data residency
- Migration roadmap — Phased timeline, risk register, and resource estimation
- Cost modelling — Projected migration spend and ongoing operational costs compared to current state
Deliverables#
- Infrastructure Report — Detailed documentation of your current cloud estate
- Migration Plan — Step-by-step roadmap with dependencies and timelines
- Cost Model — Projected costs for both migration and ongoing operations
- Risk Register — Identified risks with probability, impact, and mitigations
- Executive Summary — Board-ready presentation of findings and recommendations
A typical assessment takes 2–4 weeks depending on the complexity of your infrastructure.
Application modernisation#
Not every workload should be lifted and shifted. Some need to be rethought.
- Decomposition — Monolith-to-microservices analysis and domain boundary mapping
- Containerisation — Packaging existing applications for Kubernetes deployment
- Cloud-native refactoring — 12-factor principles, stateless design, and externalised configuration
- Replatforming — Strategies for adopting managed services and reducing operational overhead
- Incremental modernisation — Strangler fig pattern and parallel-run validation
Migration execution#
We don’t do big-bang migrations. Instead, we pilot, iterate, migrate, and validate.
- Platform-to-platform migration — Migration from AWS, Azure, or GCP to EU-sovereign T Cloud
- On-premises to cloud — Migration from traditional hosting to EU public cloud
- Database migration — Online migration and synchronisation between source and target databases with zero-downtime and data validation
- Storage migration — Object, block, and file — with automated verification
- Network cutover — DNS cutover, load balancer reconfiguration, and firewall rule translation
- Phased execution — Pilot, iterate, migrate, validate
Let's talk